The City of New Iberia Wastewater Department serves the sanitary sewage collection, transfer and treatment needs of over 33,000 City users and 1,500 Parish users.

The City's Sanitary Wastewater Sewerage System consists of two wastewater treatment facilities, 120 miles of sewer line, 2,200 manholes and 75 pump stations.

The newly constructed Sucrose Drive Treatment Plant was commissioned in early 2007. This plant is designed to treat a daily average flow of 6 million gallons per day (MGD).  The treatment facility is known as the Parker Street Plant (aka Tete Bayou Plant) is owned jointly with the Iberia Parish Sewerage District No. 1 and is designed to treat a daily average flow of 2.5 MGD. 

To service, the municipal sanitary sewerage system Wastewater Department personnel are working 24 hours a day.  If you are having a sewer emergency, including an overflow event, please contact our Department at the following numbers:

•    Monday – Friday 7 am – 4:30 pm: (337) 369-2347
•    Monday – Friday after 4:30 pm: (337) 373-3111     

•    Weekends: (337) 373-3111                           
•    Holidays: (337) 373-3111                                               

To report water leaks/repairs – Please call LAWCO at (337) 365-0002 or after hours at (337) 364-3023.

For sewerage service outside of city limits – Please call Iberia Parish Sewerage District #1 at (337) 369-2376.

For tips to prevent sewer overflows and backups click here.

For facts on infiltration and inflow click here.

 

 

WASTEWATER DEPARTMENT
 

Craig Girouard
Director
Waste Water Department
800 Sucrose Drive
New Iberia, LA 70560
Phone: (337) 369-2347
Fax: (337) 369-2366
E-mail: cgirouard@cityofnewiberia.com


Sucrose Drive Plant
Waste Water #4
Phone: (337) 369-2347
Plant Fax: (337) 369-2366
bottom of page